Deck Update #5
By CosmicConservativeSo I've got the framing done, the joists hung and leveled (I learned a lot about using a plane today).
Now it's time to rebuild the stairs.
I was forced to actually use geometry to work out the pattern to cut for the stair supports. And people say they never use math in real life. Hmph.
I have one of the stair supports cut, but it needs a little fine tuning to fit snugly against both the deck and the concrete base on the ground. An hour or so of using a rasp ought to finish it up, then I'll use that one as a template for the other one. Then it's just a matter of installing the steps.
Oh, one more little hurdle to overcome. How to drive nails into solid concrete. I know there are nails that are used for that, but all the online references I've seen seem to assume you are using a nail gun. I assume you can use a hammer, but maybe it's just too hard to hammer in. Anyone ever driven nails into concrete before?
Once that's done, it will be time to seal and paint. Then it will be time to lay the Trex decking material.
I figure this weekend to wrap up the stairs, maybe even to seal and paint if I get a good start each day. And next weekend for the Trex.
It's starting to feel like I may actually complete this "little" project.